Working on the Old Lathe

About a year after I finished my apprenticeship, I looked for another job closer to home. At this time, I had married Jan, moved from my parents place and traveling to and from work was certainly a distance. Of cource this was mostly riding to and from on my good old Norton Commando. I did get a job with about 20 minutes travel time so this suited me well.  I was employed to check out the production machinery in the main factory to see why they were not working up to speed and why some broke down a lot. Also looking at improvements and just getting machines to work faster and be more reliable.

During the interview we were in the main workshop, full of machinery that we used to make up parts and repair. There was already three other guys working there. I was number four. While looking at the machines, I said to the boss, “Boy, that big lathe is certainly an old war horse. What a beaut, it will be great working on that machine.” The reply came back, “we don’t use it.” OK, so we just moved on. I started there a few days later and after a while, I said to one of the guys there, nicknamed “Old Jim”, “how come we don’t use the old lathe?”. Old Jim said, “we just don’t use it ok.” Right so I left that alone and didn’t bother asking again. But gee this old lathe certainly had its own charisma and had seen many hours of work in its time. It had a date stamp on it 1896. The sizing was ten feet between centres and 18 inch centre hight. Plus a cut out bed to swing up to four feet diameter. Also a very large four jaw chuck. It was a big lathe for certain! The other side of this is, we used to send out the larger machining work to a business in South Melbourne and wait two weeks to get it back and then reinstall the parts back into the broken down production machinery. In the mean time, that machine was out of action.

Then a situation happened in the factory. A reduction gear box had worn its large bushed bearing. The gear itself was about two feet diameter which, as you can guess will require a large lathe to be able to rebore the bush after installing a new one. There was a meeting with the production  manager, workshop manager, Old Jim, myself and a couple of others. The workshop manager said that the gear would have to be sent out to the business in South Melbourne and would be away for two weeks. The production manager said, “we can’t wait that long, this production job has to be finished and delivered by the end of the week or we have broken our contract and it will not look very good at all ! I came up with a solution, “can we do the job in the old lathe?” I got looked at by everyone and Old Jim said, “look mate, we just don’t use that old bloody lathe.”. The production manager looked like he had seen a solution to the problem and then a disappointed one after what Old Jim had said. The meeting broke up and the workshop manager talked to me about checking to see if the old lathe could be used?

So for the next hour myself and another guy checked the old lathe out to see what its problems were. Basically nothing. We checked the power, bearings, motor and other parts and then we started it up. It certainly ran ok. Flat out at 180rpm. Did a few trial cuts and then announced that we could ago ahead and re-bush the reduction gear and should have the machine up and running the following day. Old Jim walked past and said, “you young bucks will learn one day”. We just looked at him and got on with the business of getting the job done.

We had to get in some new bronze material to re-bush the gear. That involved machining the outside diameter to fit the gear and rough boring the inside diameter so as to be able to bore it to the finish size in the old lathe. Old Jim kept walking past and laughing at us. We just ignored him and kept on with the job. We stayed back to about 10PM that night working away and came in early the next day at 7AM. Old Jim came in at 8AM and said, “you idiots must have been here all night?” We just replied, “yeah that’s right.” Somehow we felt like we needed to get back at him.

The next part was doing all the machining work on the old lathe. Have to admit, it was a roughy but it did its job if you worked with it and respected it. We got along just fine ! Moving on to about midday, we had the gear re-bushed, fully machined and fitted back into the reduction gear box and ready to go back into production. The production managed was so grateful and certainly appreciated our input. Old Jim just smirked and kept telling us we were jerks and one day we would learn ! 

The reduction gear box certainly worked well after all our work and the old lathe ended up being used much more often after that and got the factory out of trouble on quite a few occasions. Old Jim never really appreciated us younger workers but realistically, I don’t think he really cared.

I am now older than what Old Jim was back when this situation happened.